Explore Projects

  • COMPANIES

  • MARKETS

  • RESET FILTER
Found 9 Results
Page 1 of 1

City of Akron CMOM


The City of Akron, Ohio, is working on a multi-year Long-Term Control Plan under the direction of the U.S. Environmental Protection Agency to reduce sewer overflows. The City is taking steps to drastically reduce combined sewer overflows and increase the capacity of its sewage system and water reclamation facility. Equix has 3 to 4 crews […]

Tags:

September 21, 2022


Cross Bore Inspections


Since 2014, Equix has worked for a natural gas utility in several states throughout the country. We have more than 20 teams working daily to perform cross bore inspections in City wastewater lines. Our crews perform 30,000+ locates per year, equating to completing over 1.5 million linear feet (or 284 miles) of inspections annually! Impressive work! […]

Tags:

September 20, 2022


Upper Proctor Creek Capacity Relief at Rodney Cook, Sr Park in Historic Vine City


The City of Atlanta Department of Watershed Management selected Astra for the Construction Management at Risk (CMAR) delivery of Upper Proctor Creek Capacity Relief Project at Rodney Cook, Sr Park in Historic Vine City.

Tags: ,

August 15, 2022


Midwest Derecho


Midwest Derecho was a severe weather event that took place across the Midwestern US. The storm caused notable widespread damage from high winds and an outbreak of tornadoes. Mi-Tech’s Storm Services team worked in three (3) Alliant Energy zones that took extreme damage from the storm. Our team’s role was to inspect the power grid and […]

Tags:

December 18, 2020


Northside Drive Road Improvements


Astra completed intersection improvements on Northside Drive/State Route 3 at Collier Road/City Street 53. This $26 million project includes two (2) miles of road realignment, installation of intersection video detection systems, and concrete retaining walls. Astra installed 12,880 LF of 36” DIP water main, storm drainage, intersection improvements, right-of-way improvements, including sidewalk, multi-use trail, boardwalk, ADA access, and landscaping along Northside Drive. Our […]

Tags:

December 11, 2020


Southwest Florida Expansion Pipeline


Equix installed 42+ miles of 8” steel pipeline in two (2) phases — Phase 1 consisted of 22 miles and Phase 2 was 20+ miles. Project Highlights​ Completed 3 months ahead of scheduled in-service date 5333 total welds completed .00038 weld repair rate Construction Methods Mainline Pipeline HDD

Tags:

October 13, 2020


Port of Savannah International Multi-Modal Connector


Astra is completing the $102 million rail expansion for the Port of Savannah’s International Multi-Modal Connector (IMMC) project at the Garden City Terminal near Savannah. The civil infrastructure portion, which was completed on time in Summer 2019, consisted of providing soil improvements, earthwork, drainage and erosion control within and adjacent to the James D. Mason […]

Tags:


South Texas Wind Farm


Equix is proud to have been a construction partner on a 63 turbine wind project in south Texas. Our 180+ crew members were able to complete the following work on the system: Construction of 36 miles of access road Production and installation of over 41,000 cubic yards of concrete for the foundations supporting the 120m […]

Tags:


Big Corkscrew Island Regional Park


Astra is currently constructing a new 59-acre regional park in Naples, FL. Big Corkscrew Island Regional Park is in Phase 1 of development which includes construction of four soccer fields, two baseball-softball fields, two outdoor basketball courts, two tennis courts, six pickleball courts, two pavilions for concessions, an aquatic center, a playground, a dog park, […]

Tags:


Page 1 of 1