The City of Akron, OH is working on a multiyear Long-Term Control Plan under the direction of the U.S. Environmental Protection Agency to reduce sewer overflows. The City is taking steps to drastically reduce combined sewer overflows and increase the capacity of its sewage system and water reclamation facility. EQUIX has three to four crews […]

Tags: Integrity
September 21, 2022
Since 2014, EQUIX has worked for a natural gas utility in several states throughout the country. We have more than 20 teams working daily to perform cross bore inspections in city wastewater lines. Our crews perform 30,000-plus locates per year, equating to completing more than 1.5 million linear feet (or 284 miles) of inspections annually! […]

Tags: Integrity
September 20, 2022
The City of Atlanta Department of Watershed Management selected ASTRA for the construction management at risk (CMAR) delivery of Upper Proctor Creek Capacity Relief Project at Rodney Cook Sr Park in Historic Vine City. The project, located between Joseph E. Boone Boulevard, Walnut Street, Thurmond Street, and Elm Street addresses sewer system capacity relief for the Mineral […]

Tags: Heavy Civil, Parks & Recreation
August 15, 2022
ASTRA completed intersection improvements on Northside Drive/State Route 3 at Collier Road/City Street 53. This $26 million project includes 2 miles of road realignment, installation of intersection video detection systems, and concrete retaining walls. ASTRA installed 12,880 LF of 36-inch DIP water main, storm drainage, intersection improvements, and right-of-way improvements, including sidewalk, multiuse trail, boardwalk, ADA access, and landscaping along Northside […]

Tags: Heavy Civil
December 11, 2020
https://www.youtube.com/embed/3Kfpk6Po75U EQUIX installed 42-plus miles of 8-inch steel pipeline in two phases: Phase 1 consisted of 22 miles, and Phase 2 was 20-plus miles. Project Highlights Completed 3 months ahead of scheduled in-service date 5,333 total welds completed 0.00038 weld repair rate Construction Methods Mainline Pipeline HDD

Tags: Oil & Gas
October 13, 2020
ASTRA is completing the $102 million rail expansion for the Port of Savannah’s International Multi-Modal Connector (IMMC) project at the Garden City Terminal near Savannah. The civil infrastructure portion, which was completed on time in Summer 2019, consisted of providing soil improvements, earthwork, drainage, and erosion control within and adjacent to the James D. Mason […]

Tags: Heavy Civil
ASTRA is currently constructing a new 59-acre regional park in Naples, FL. Big Corkscrew Island Regional Park is in Phase 1 of development, which includes construction of four soccer fields, two baseball/softball fields, two outdoor basketball courts, two tennis courts, six pickleball courts, two pavilions for concessions, an aquatic center, a playground, a dog park, […]

Tags: Parks & Recreation