Water / Wastewater

Equix Integrity stands out with cured-in-place point repair as an alternative method to full length CIPP.  DIS’s experienced staff utilizing CCTV and Steam trucks accurately pull the section of liner to the damaged section of the host pipe. The liner is then impregnated, cured, and televised to insure proper installation. This technology strengthens and seals the deteriorated or damaged portion of host pipe, allowing the pipe to support soil and live loads.