Mainline Pipeline Trenching

Equix Energy worked on the 30” Crude Pipeline trenching for Spread 4 & 5 for a total of 549,000 linear feet on Spread 4 which started in Spofford, TX and ended in Cotulla, TX. Spread 5 consisted of 580,000 linear feet, starting in Cotulla, TX and terminating in Robstown, TX.

The crew used two bucket wheel trenchers and two 1460 trenchers to cut a 48” trench the duration of the route. Equix Energy was able to average 10,000 feet per day!